欧美日本一线视频,狼友视频少妇向日的日子,欧美猛交ⅹxxx乱大交视频,一级不卡中文字幕精品片

NewsHome > News > Industry dynamics

Secret Record of Maintenance and Maintenance of Grazing Machine
release time:2019-3-28 15:49:00      hit count:2102

Daily pre-start check

1. Check oil and coolant leakage, record tire damage, hose extrusion deformation, bolt loosening or edge wear.

2. Removal of debris, residues and garbage from loose areas of bulldozers or discs

3. Check and ensure that the bulldozer slides and the top surface of the disc are clean.

4. Ensure that the safety signs are clean and in good condition. If damaged, lost or blurred, replace in time.

5. Clean the cockpit glass and check that all rearview mirrors are in place.

6. Before starting the grader, make sure that all the tools and other unfixed items on the machine are clear.

7. Visual inspection of brake fluid level through translucent main cylinder container. The liquid level should be at the flange of the container, not more than 1 inch from the top of the cap.

8. Check once a week or 50 hours of work. The daily pre-startup inspection method should also be used during the inspection.


Previous: Precautions for cement pavement construction: preparation before paving
Next: What if the drill pipe of rotary drilling rig drops slowly?

Back to list

News you are interested in
尖扎县| 漳浦县| 呼和浩特市| 河源市| 三亚市| 将乐县| 丰台区| 万宁市| 忻州市| 漯河市| 喜德县| 盐池县| 于田县| 敦化市| 娄底市| 合川市| 兖州市| 枝江市| 洪泽县| 新沂市| 邵武市| 辉县市| 萨迦县| 大足县| 闸北区| 卓尼县| 莲花县| 和政县| 青岛市| 祁连县| 壤塘县| 库伦旗| 贺州市| 高清| 新安县| 萨嘎县| 外汇| 象山县| 衡阳县| 宁乡县| 华容县|