欧美日本一线视频,狼友视频少妇向日的日子,欧美猛交ⅹxxx乱大交视频,一级不卡中文字幕精品片

NewsHome > News > Industry dynamics

Secret Record of Maintenance and Maintenance of Grazing Machine
release time:2019-3-28 15:49:00      hit count:2102

Daily pre-start check

1. Check oil and coolant leakage, record tire damage, hose extrusion deformation, bolt loosening or edge wear.

2. Removal of debris, residues and garbage from loose areas of bulldozers or discs

3. Check and ensure that the bulldozer slides and the top surface of the disc are clean.

4. Ensure that the safety signs are clean and in good condition. If damaged, lost or blurred, replace in time.

5. Clean the cockpit glass and check that all rearview mirrors are in place.

6. Before starting the grader, make sure that all the tools and other unfixed items on the machine are clear.

7. Visual inspection of brake fluid level through translucent main cylinder container. The liquid level should be at the flange of the container, not more than 1 inch from the top of the cap.

8. Check once a week or 50 hours of work. The daily pre-startup inspection method should also be used during the inspection.


Previous: Precautions for cement pavement construction: preparation before paving
Next: What if the drill pipe of rotary drilling rig drops slowly?

Back to list

News you are interested in
三江| 嘉义市| 柳州市| 西贡区| 和政县| 苏尼特左旗| 临夏市| 罗甸县| 福贡县| 梁河县| 宣化县| 常山县| 孟津县| 汉源县| 永修县| 桐庐县| 晋中市| 白玉县| 诸城市| 深水埗区| 五华县| 盖州市| 原阳县| 乌鲁木齐市| 葫芦岛市| 温宿县| 定南县| 黑水县| 安远县| 红原县| 广安市| 乐业县| 蒙阴县| 旌德县| 通城县| 浏阳市| 当涂县| 岳阳市| 武隆县| 大英县| 铜陵市|