欧美日本一线视频,狼友视频少妇向日的日子,欧美猛交ⅹxxx乱大交视频,一级不卡中文字幕精品片

NewsHome > News > Industry dynamics

How many meters can a concrete paver spread a day?
release time:2019-11-14 15:38:00      hit count:2433

圖片2(1).jpg

How many meters can a concrete paver spread a day? The specific number of meters that can be paved is not fixed. It depends on the specific project, the difficulty of the project, and the on-site feeding, the cooperation of the workers, and many factors. And there are weather conditions. Specific engineering specific analysis.

1. Is the personnel scheduling reasonable?

2. Whether the various machines are working properly.

3. Paving the width and thickness of the pavement

4. Paver operator proficiency

5. Model configuration of paver

6. Weather

7. Construction environment (such as the distance of the material yard, the size of the transport vehicle, etc.), etc.

Therefore, how many meters can be spread in a day, there is no way to calculate, generally slow progress can also spread about 500 meters, the speed is fast, 2-3 kilometers a day also.

Welcome information Xuzhou New Road Intelligent Technology Co., Ltd.

Xuzhou Xinlu Intelligent Technology Co., Ltd. was established on January 31, 2019. It is a modern intelligent technology company jointly established by Xuzhou Xinluyuan Machinery Technology Co., Ltd. and Jiangsu Jiji Road Engineering Technology and Equipment Research Institute Co., Ltd.

The company is mainly engaged in multi-functional cement concrete slipform paver, curb stone slipform paver, roadside stone forming machine, water strip sliding mold machine, shoulder molding machine, New Jersey anti-collision guardrail forming machine and other cement concrete pavement maintenance equipment. R & D, manufacturing and sales; provide a variety of cement concrete anti-collision guardrails, gutters, shoulders, curbs / roadside stone and other structural sliding form construction plans; research and extension of the foundation and new materials in cement concrete sliding form Application in paving construction.

圖片3(1).jpg


Previous: How many meters can the curb stone slide be made a day? How is the construction efficiency?
Next: The role of concrete additives in improving concrete sliding form construction

Back to list

News you are interested in
永善县| 巴青县| 双鸭山市| 阿克陶县| 都安| 阳曲县| 礼泉县| 邵阳县| 吐鲁番市| 霞浦县| 荆门市| 四会市| 保山市| 高台县| 玛多县| 庄浪县| 建水县| 聂荣县| 南川市| 威海市| 东港市| 富平县| 黄冈市| 浑源县| 巴南区| 郎溪县| 磴口县| 桓仁| 鄂州市| 铁力市| 新竹县| 沾化县| 通州区| 益阳市| 三穗县| 高邑县| 涡阳县| 叙永县| 潮安县| 安康市| 乡城县|