欧美日本一线视频,狼友视频少妇向日的日子,欧美猛交ⅹxxx乱大交视频,一级不卡中文字幕精品片

NewsHome > News > Company news

Significance of continuous slipform paving for bridge deck curb stone slipform paver
release time:2020-3-21 15:33:07      hit count:2330

   With the speeding up of highway construction in China, the paving technology of cement concrete pavement slipform machinery-curbstone slipform paver has been widely promoted and applied, and more and more large, large, medium and small bridges, overpasses, The technical problems of mechanized pavement of single-double-layer reinforced concrete bridge (culvert) surfaces of passages, culverts, and bridgeheads need to be solved through research and engineering practice.

93ab75558c0586a545d12cac6dae8d7.jpg

   Due to the high overall smoothness and durability required of highways, technically, cement concrete pavements, reinforced concrete bridge decks, and reinforced concrete decks at bridge heads are required to achieve continuous paving by curbstone slipform pavers. In order to improve the overall smoothness of the cement concrete pavement, the pavement of extra large, large, medium and small bridges, culverts and passages is paved with curbstone slipform paver when the pavement is slipped. In this way, a high-density, high-flatness bridge deck with the same quality as a slipform paving cement concrete pavement can be obtained. When a motor vehicle runs through these continuously paved bridges (culverts) at high speeds, it is not felt that they are passing through the bridges and culverts, and there is no bumping vibration bumps and no need to decelerate.

   Along the highways in China, due to the large population and dense villages, except for some remote provinces and regions, on average there are more than 3 bridges and culverts and passages per kilometer of highways. If we use the curbstone slipformer for mechanized construction, we can only pave the pavement, and we cannot continuously pave the reinforced concrete bridge deck. The bridge (culvert) surface and the slab are manually constructed, which will inevitably cause slipform machinery that will seriously affect the cement concrete pavement The speed of construction prevents the benefits of large slipform machinery from being fully utilized. On the other hand, the construction quality and overall flatness of the bridge and culvert pavement on the expressway are reduced.

   Objectively, highways, regardless of the cement concrete pavement and reinforced concrete bridge deck, must use curbstone slipform to talk about the pavement mechanized pavement construction technology to ensure its construction quality. Otherwise, the manual construction method will continue to be used. Under such a strong destructive force on the highway, the bridge deck pavement layer cannot be resisted, and serious damage may occur 3 to 5 years after opening to traffic. Currently, rigid bridge deck pavement Repair of the coating is quite difficult.


Previous: Omnidirectional concrete curbstone slipform paver-New curb NC1300
Next: Welcome Minister Xu Donghai and his party to visit our company to inspect and guide our work

Back to list

News you are interested in
毕节市| 昌都县| 石渠县| 莫力| 醴陵市| 卫辉市| 铜陵市| 尼勒克县| 财经| 西昌市| 罗田县| 白银市| 平罗县| 淮南市| 云龙县| 磴口县| 三门峡市| 壶关县| 汝南县| 安西县| 宣恩县| 稻城县| 万宁市| 汝城县| 泰顺县| 浮山县| 瑞丽市| 龙里县| 无棣县| 平泉县| 凉山| 广昌县| 工布江达县| 仙游县| 涞源县| 吉林省| 彭州市| 青冈县| 菏泽市| 保山市| 泸水县|